Using the Pump for a floor in a warehouse with about 500 ft² of concrete to pour.
The hotel had a hole through the asphalt, but it had a four foot drop off instead of having dirt. At this point it became an elevated slab.
Getting a 50 ft trench ready for pour. we have rebar, visqueen and pesticide certificate ready.
Here we are framing the area that is gonna be part of a new wall.