The hotel had a hole through the asphalt, but it had a four foot drop off instead of having dirt. At this point it became an elevated slab.

Elevated Slab
Fixing a hole on the ground.
Share on facebook
Share on twitter
Share on linkedin
Share on whatsapp
Share on email

Leave a Reply