This is the trench that was one hundred foot long in the areas that were 6 inches thick. We quickly realized that this floor had a lot of over pour which can go from 14 inches to 18 inches thick.
This is the trench that was one hundred foot long in the areas that were 6 inches thick. We quickly realized that this floor had a lot of over pour which can go from 14 inches to 18 inches thick.
Share
Tags
Related Content
Copyright © 2015 - 2024 All Rights Reserved
Concrete Cutting Miami, LLC
13818 SW 152nd St. STE 249 Miami, Florida 33177
Concrete Cutting Equipment by Saw King