Guiding the bucket
Trying to remove some concrete blocks that fell in the water after we cut it.
Trying to remove some concrete blocks that fell in the water after we cut it.
Putting together some last minute details, about to Wire Saw some concrete.
We are setting four anchors to hold the Track Saw. Each anchor holds about 3 to 5 thousand pounds.
Some last minute check up, making sure the anchors are tight and secured before firing up the Wire Saw.
Sometimes the wire saw has to be adjusted or else things can go wrong real quick.
Inspecting the wire saw after we finished wire sawing a concrete structure. just want to make sure there is no damage done to the Wire Saw.
Here the guys are trying to wrap the wire around a concrete structure on the side of a dock in Marathon Keys