The hotel had a hole through the asphalt, but it had a four foot drop off instead of having dirt. At this point it became an elevated slab.
Getting a 50 ft trench ready for pour. we have rebar, visqueen and pesticide certificate ready.
Here we are framing the area that is gonna be part of a new wall.
Copyright © 2015 - 2023 All Rights Reserved
Concrete Cutting Miami, LLC
13818 SW 152nd St. STE 249 Miami, Florida 33177
Equipment by Saw King